The plants for extraction of drinking water from the river water of the Danube specifically comprise an untreated water pumping station that takes the water directly from the river, a pressure pipe from the pumping station to Langenau waterworks, and the treatment plants at the waterworks. At peak times, up to 2,300 litres of Danube water per second can be processed into drinking water. The process for drinking water extraction from the Danube has been investigated and optimised over many years of trials.
It essentially comprises the following process steps:
Technical effort that is
worthwhile – Modern
filtration plants and
constant quality monitoring
ensure clean drinking
water at all times.